City of Hamilton
HERITAGE PERMIT REVIEW SUB-COMMITTEE
AGENDA

Meeting #:21-013
Date:
Time:
-
Location:
Due to the COVID-19 and the Closure of City Hall
All electronic meetings can be viewed at:
City’s YouTube Channel: https://www.youtube.com/user/InsideCityofHamilton

Shannon McKie, Senior Project Manager (905) 546-2424 ext. 1288


(Added Items, if applicable, will be noted with *)

  • Replace the existing cedar shake roof with asphalt shingles (TruDefinition Duration shingles)
  • Proposed colours are either Brownwood, Estate Grey or Teak, depending on availability
  • Install a Daikin Inverter Heat Pump on garage roof
  • Heat pump would be located under metal fire escape stairs beside west facing wall of building
  • Control wiring, refrigeration and drain lines would run horizontally under limestone wall (affixed to aluminum flashing)
  • Lines would enter unit through two 3” diameter holes drilled 37” above garage roof line utilizing grouting
  • To install two floodlights to rear of building one masonry course below second storey windows, one light at the bottom of west facing stairwell, and a security camera on the side façade
  • Holes will be drilled through mortar joints to minimize damage to stonework

11.

No Item Selected