City of Hamilton
HERITAGE PERMIT REVIEW SUB-COMMITTEE
AGENDA

Meeting #:
23-007
Date:
Time:
-
Location:
YouTube Channel Streaming for Virtual Meetings
All electronic meetings can be viewed at:
City’s YouTube Channel: https://www.youtube.com/user/InsideCityofHamilton

Lisa Christie, E-mail: Lisa.Christie@hamilton.ca, Phone: ext. 1291

Emily Bent, E-mail: Emily.Bent@hamilton.ca, Phone: ext. 6663


(Added Items, if applicable, will be noted with *)

  • Roof repairs, including:
    • Removal of the existing roof system and flashing;
    • Reconstruction of the existing chimney and parapet walls to the roof deck;
    • Repairs to the masonry, including the replacement of damaged bricks and mortar joints;
    • Repairs to the roof deck;
    • Installation of new asphalt roofing shingles and metal flashing; and, 
    • Installation of new fascia board, eave troughs, and downspouts. 
  • Removal of the existing rear sun porch and addition;
  • Reconstruction of a rear dormer clad with slate shingles, presently a flat roof element;
  • Construction of an addition in the rear yard along the east elevation;
  • Removal, storage and reinstallation of two historic windows on the north and east; and
  • Construction of a new deck on the east elevation.
  • Removal of the existing contemporary additions, including:
    • Two-storey brick addition along the front (south) façade;
    • One-storey porch, and balcony, along the rear (north) façade; and,
    • Enclosed porch along the east façade.
  • Construction of new additions, including a:
    • One-storey addition in the rear yard; and,
    • Porch along the east façade and the front (south) elevation.
  • Installation of a new exterior door along the front (south) elevation;
  • Reconstruction of the box cornice to match the existing design;
  • Masonry reconstruction on the front façade, as needed and,
  • Replacement of the existing asphalt shingle roof with new metal shingle roofing. 
  • Installation of two HVAC (heat-pump) units and piping to be mounted along the north and south (side) exterior elevations; and,
  • Installation of a new exterior exhaust vent to facilitate interior renovations.
  • Exterior alterations to the front elevation, including:
    • Masonry repairs, including:
      • Replacement of damaged brick, as needed;
      • Repointing of missing or damaged mortar joints, as needed;
      • Cleaning of coping stone along the parapet wall.
    • Installation of a concealed box gutter system on the first and second storeys, including the widening of the three brackets along the cornice on the ground floor to conceal the new gutter system;
    • Installation of exterior double-doors within the two recessed entrances;
    • Installation of mouldings and trim; and,
    • Installation of decorative finials along the window ledges of both storefronts. 

11.

 
No Item Selected