City of Hamilton
HERITAGE PERMIT REVIEW SUB-COMMITTEE
AGENDA

Meeting #:
Date:
Time:
-
Location:
YouTube Channel Streaming for Virtual Meetings
All electronic meetings can be viewed at:
City’s YouTube Channel: https://www.youtube.com/user/InsideCityofHamilton

Alissa Golden, E-mail: [email protected], Phone: ext. 1202

Lisa Christie, E-mail: [email protected], Phone: ext. 1291 

Meg Oldfield, E-mail: [email protected], Phone: ext. 7163

Scott Dickinson, E-mail: [email protected], Phone: ext. 7167

 


(Added Items, if applicable, will be noted with *)

  • Item to be received, reviewed last meeting however could not be received as quorum was not present at time of decision.
  • Installation of mechanical upgrades on the University Hall building, including;
    • Installation of two new passive ventilation hoods along the central core of the flat roof area, made of prefabricated metal housings with a galvanized finish, projecting approximately 32” above the roof surface; and,
    • New intake/exhaust ventilation grilles to be installed in two panes of an existing window opening on the north end of the building. 

Note: This property received conditional approval from HPRS for a heritage permit which included a similar scope of work in 2022. HP2022-034 was approved in December 2022, the previous heritage permit expired December 31, 2024.

  • Replacement of existing corroded steel windows on the former Princess Elizabeth School with new wood and aluminum window frames in a similar design to the existing windows.
  • Demolition of existing non designated structure on property; and
  • Construction of new single-family home in a similar location.

 Note: This scope of work was reviewed by HPRC as a Pre-Consultation on April 15, 2025.

  • Construction of new one-storey detached (24’ x18’) garage, including;
    • A one door garage on the first storey;
    • Horizontal wood siding; and
    • Asphalt shingles.

10.