- Installation of mechanical upgrades on the University Hall building, including;
- Installation of two new passive ventilation hoods along the central core of the flat roof area, made of prefabricated metal housings with a galvanized finish, projecting approximately 32” above the roof surface; and,
- New intake/exhaust ventilation grilles to be installed in two panes of an existing window opening on the north end of the building.
Note: This property received conditional approval from HPRS for a heritage permit which included a similar scope of work in 2022. HP2022-034 was approved in December 2022, the previous heritage permit expired December 31, 2024.